This was an FEBT Rockhill Restoration work weekend.
Hopper 802 [2005mar12,airpipe]
600x408 (54k) -
1200x815 (161k)
Installing the new airpipe. Wow, check out the snow.
Hopper 802 [2005mar12,center1]
600x409 (52k) -
1200x818 (137k)
Maneuvering the new center bulhead into position.
Hopper 802 [2005mar12,center2]
326x480 (26k) -
612x900 (61k)
Securing the center bulkhead. Snow on, snow off. Went that way all weekend.
Flat 119 [2005mar12,flat1]
325x480 (38k) -
610x900 (97k)
With the seats removed, the old rotted decking comes off.
Flat 119 [2005mar12,flat2]
600x407 (58k) -
1200x813 (155k)
Decking gone.
Machine Shop [2005mar12,shop1]
324x480 (38k) -
608x900 (95k)
Installing new glass in the machine shop west wall (facing the creek).
Machine Shop [2005mar12,shop2]
600x409 (44k) -
1200x817 (120k)
Still needs work, but looking better!
[2005mar12,latch]
600x405 (68k) -
1200x810 (200k)
The replacement door latches are test fit on the new center bulhead.
page by Bill Adams