This was an FEBT Rockhill Restoration work weekend.
Flat 119 [2005feb5,flat1]
600x409 (55k) -
1200x817 (144k)
Getting started on the redecking and re-handrailing of flat car 119.
Flat 119 [2005feb5,flat2]
600x408 (61k) -
1200x815 (160k)
Initial deconstruction on flat car 119.
Hopper 802 [2005feb5,hopper1]
600x413 (42k) -
1200x825 (109k)
Work continues on side dump hopper 802, one slope sheet lighter.
Hopper 802 [2005feb5,hopper2]
600x407 (49k) -
1200x814 (148k)
Work continues on side dump hopper 802, now two slope sheets lighter.
Hopper 802 [2005feb5,hopper3]
600x410 (50k) -
1200x820 (135k)
Work continues on side dump hopper 802, and now four slope sheets lighter.
Paint Shop [2005feb5,paintshop]
328x480 (38k) -
615x900 (95k)
The paintshop in winter afternoon sunlight.
Saltillo [2005feb5,salt]
600x408 (44k) -
1200x816 (126k)
Still haven't been able to pass by Saltillo without a picture. I never took
notice before of the streetname parallel to the tracks, "EBT Station Rd".
A marker for the future EBT fans.
page by Bill Adams