This was an FEBT Rockhill Restoration work weekend.
Main Shops Entrance [2004sep25,shop]
600x409 (50k) -
1200x818 (139k)
The siding around the main shops entrance is repaired and primed.
Boiler House [2004sep25,boilerhouse]
600x407 (60k) -
1200x814 (163k)
Supplies for track 3 get loaded while repairs are made to the boiler house.
Wood Chipper [2004sep25,chipper]
600x405 (78k) -
1200x810 (216k)
This wood chipper, on loan from a volunteer, helped the brush crew dispose of
all they had cut.
Track 3 [2004sep25,track3]
600x410 (101k) -
1200x819 (285k)
The crew takes a break from installing switch timbers on track 3.
Roof Canyon [2004sep25,canyon]
600x407 (38k) -
1200x813 (102k)
The new false roof in the roof canyon. It will be covered with a rubber membrane
later.
page by Bill Adams