This was the first regular FEBT Rockhill Restoration work weekend, with work being performed on several projects.
Boiler house [2004mar13,scaffold]
324x480 (29k) -
608x900 (59k)
Scaffolding is erected between the boiler and the boiler house wall in
preparation for repairs to the top interior portion of the wall.
Caboose no. 28 [2004mar13,torch]
600x410 (47k) -
1200x819 (127k)
After expending a lot of effort to abrasively cut the new platform steel for
one end, an alternative approach is used on the steel for the other platform.
Caboose no. 28 [2004mar13,paint]
600x406 (60k) -
1200x812 (154k)
New sheathing boards are primed prior to installation.
Caboose no. 28 [2004mar13,sheathing]
600x408 (40) -
1200x815 (107k)
The new sheathing starts to go on. This job, like the entire caboose project,
ended up taken quite a bit more time than estimated.