Back to the grindstone. Several projects are underway and a few more get started. I also took a bunch of modeling reference photos.
Flatcar 117 [2003jun28,flat1]
600x409 (56k) -
1200x818 (165k)
Three quarter side view of flatcar 117.
Flatcar 119 [2003jun28,flat2]
600x412 (61k) -
1200x824 (168k)
Side view of flatcar 119.
Flatcar 119 [2003jun28,flat3]
600x409 (55k) -
1200x818 (150k)
End and step detail on flatcar 119.
Flatcar 119 [2003jun28,flat4]
327x480 (39k) -
614x900 (96k)
End and step detail on flatcar 119.
Flatcar 119 [2003jun28,flat5]
329x480 (35k) -
617x900 (85k)
The deck of flatcar 119.
Combine 15 [2003jun28,combine15]
600x408 (53k) -
1200x815 (150k)
Side view of combine 15.
Combine 14 [2003jun28,combine14]
600x409 (52k) -
1200x817 (143k)
Side view of combine 14.
Boiler House Roof [2003jun28,roof1]
600x416 (47k) -
1200x831 (134k)
Preparing sisters for the rafters on the boiler house.
Generator Room [2003jun28,gen1]
600x410 (36k) -
1200x820 (95k)
Continuing repairs to the generator room and new roof.
Boiler House Roof [2003jun28,roof2]
328x480 (31k) -
615x900 (75k)
Sistering the boiler house rafters. Several more folks are inside the
boiler house fastening the sisters higher up on the existing roof.
Boiler House Roof [2003jun28,roof3]
600x411 (37k) -
1200x822 (104k)
Installing temporary roof sheathing on the boiler house.
Elevated View [2003jun28,highview]
600x416 (45k) -
1200x832 (128k)
When you're up here, you've got to take a minute or two to enjoy the view.
Flatcar [2003jun28,flat6]
327x480 (38k) -
613x900 (103k)
Deck of one of the black flatcars.
Flatcar [2003jun28,flat7]
330x480 (28k) -
619x900 (71k)
Seat closeup on one of the black flats.
Flatcar [2003jun28,flat8]
600x409 (54k) -
1200x817 (155k)
End details of one ofthe black flatcars.
Flatcar 117,119 [2003jun28,flat9]
600x414 (59k) -
1200x828 (150k)
Step details of flatcars 117 and 119.
Caboose 27 [2003jun28,cab]
600x414 (48k) -
1200x827 (138k)
A side view of caboose 27.
Hopper 951 [2003jun28,hop951]
600x412 (47k) -
1200x823 (134k)
Side view of hopper 951 in the late afternoon sun.
Runk Rd Bridge [2003jun28,runk1]
600x416 (65k) -
1200x832 (206k)
The newly redecked bridge of Runk Rd.
Runk Rd Bridge [2003jun28,runk2]
600x411 (68k) -
1200x821 (192k)
The newly redecked bridge of Runk Rd.
Twin Stacks [2003jun28,stacks]
600x410 (42k) -
1200x820 (125k)
A view of the stacks passing through the boiler house roof. The hole in the
foreground was patched with cement and a section of roll roofing. The hole
arond the vent pipe was filled with expanding foam from the inside. A roll
of roofing material from the last time the roof was recovered is wedged between
the near stack and carshop eave.
Generator Room [2003jun28,gen2]
600x412 (45k) -
1200x823 (129k)
New facia and soffit for the generator room.
Coach 8 [2003jun28,coach]
327x480 (33k) -
613x900 (77k)
Preparing to reinstall window trim after replacing a window sill.
page by Bill Adams